Missing target costs on production order

Hello,
who can tell me at what point a released cost estimate must be available to generate target costs on a "normal" production order.
- Save
- Release
- ??
just before the WE is in any case too late

You must be logged in to post a reply.

Login now

9 Answers

  • Martin Munzel
    Martin Munzel
    Hello,
    Do you mean by "released cost estimate" the standard product cost estimate or the production order cost estimate? For the target costs, you only need the latter, and it does not have to be released separately, but is created by default when the order is costed. If this is not done, no costing variant is assigned to the order type in the plant-dependent data, or it is incorrect.
    Many greetings,
    Martin
    ----------------
    Martin Munzel
    Freelance author, SAP consultant and trainer http://www.martin-munzel.com
  • BLanger
    BLanger (Author)
    Hello Martin,
    I already need the "correct" target costs from the released product costing. The planned costs from the target cost version 1 are not sufficient for me. If the cost estimate is released with CK24 only shortly before WE, i.e. after EROF or free of FAUF, then this only leads to residual variances in KKS1/KKS2.
    Greetings
    Bernhard
  • Martin Munzel
    Martin Munzel
    Hello Berhard,
    well, then it depends on when the production order is costed - you can set it to be costed automatically when you save it or manually. But at the latest when it is released, there should be a valid costing.
    Many greetings,
    Martin
    ----------------
    Martin Munzel
    Freelance author, SAP consultant and trainer http://www.martin-munzel.com
  • Ackermann
    Ackermann
    Hello all,
    I am currently working on the topic of variance analysis for production orders.
    In variance costing, the actual costs incurred for a production order are normally compared with the target costs according to the standard costing for production materials.
    I now have the problem that it does not show me any target costs in the system in transaction CO 03.
    Thank you very much for constructive hints.

    Last edited on 01.03.12 10:15

  • Martin Munzel
    Martin Munzel
    Hello Ackermann,
    Have you already costed the order? What messages does the system output during costing?
    Many greetings,
    Martin
    ----------------
    Martin Munzel
    SAP consultant, trainer, author http://www.martin-munzel.com
  • BLanger
    BLanger (Author)
    Hello
    The target costs are only displayed if a released standard cost estimate exists before the production order is created and a GR has already been posted for the production order (i.e. an actual quantity).
    Bernhard Langer
  • Ackermann
    Ackermann
    Hello together,
    I will try it out right away. This could also be the solution, because at the moment we do not save any current standard cost estimates. Is there also the possibility to set the target costs equal to the planned costs via customizing?
    Thanks a lot
  • BLanger
    BLanger (Author)
    You define which reference value is used for the target costs in Customizing: marked cost estimate, planned costs of the FAUF etc.
  • Ackermann
    Ackermann
    That sounds good.
    In that case I will try to use the planned costs. This way I can save saving a standard cost estimate.
    Thank you and have a nice weekend